Boiler rooms will be built on the roof area, for each staircase separately. Wall gas condensing boilers Junkers will be used for heat supply (3 pcs in each boiler room, assembled by cascading principle), this system will ensure continuous power regulation, ensure rational gas consumption and guarantee the continuity of heating even if one of the boilers stop working. Apartment heating systems will be built from multi-layer pipes. The Purmo Ventil Compact wall radiators, fitted with thermostat heads, will be installed in the apartments. Each apartment will be provided with a heat meter, with a pulse output module, which will be connected to the central energy resource accounting system, providing individual metering of consumed heat.
The floors in the bathrooms will be electrically heated, thermostats and floor sensors will provide the desired temperature and comfort at any time and season.
In each bathroom, electrical outlets and a place for towel dryer is provided.